Highlights of Job
This was a complete addition of a new High School with the "old" building becoming the "new" Middle School. Cleared and removed a wooded area and an existing wetlands area to construct new football and athletic fields, ponds, building, truck, and parking lots.

Biggest Obstacle
Most of the building footprint needed to be undercut due to unstable/unsuitable fill that was previously dumped on site to fill in an old gravel pit. Schneider Excavating tight dug the footings for undercut , so slurry mix could be used. We used total station to layout footings to keep ahead of general contractor.

How Schneider Excavating’s experience played a role in this job
Surveyed stockpiles of undercut materials to determine if site earthwork would balance. Multiple grading plans were issued throughout the progression of the job. Staked curb and gutter, control points, building corners and light poles for various contractors.

 

 

 

 

Schneider Excavating, Inc.   20079 W Main Street   P.O. Box 92   Lannon, WI 53046-9741   Phone: 262-251-4200   Fax: 262-251-4216
An equal opportunity employer

Home About Us Services GPS Technology Projects News Links Contact